Huawei string Inverter and 768 pieces 390Wp Mono Gazioğlu Solar Panel was used. There is maximum strength, maximum panel efficiency, 100% impermeability guarantee in the constriction system where riveted assembly method is applied with segmented H80 profiles. Date: 15 October 2020
PROJECT DETAILS
- Project Name
Sardes Food
- Status
Completed
- Capacity
260
- Location
Salihli OSB
- Note